ACTUALITES
     
     
     
         

The park, which is open to the public, was handled over to the Conseil général d'Indre-et-Loire in 2005 to preserve, maintain, restore and develop the 100-hectare site to its full advantage. Work to be done includes:

>> Felling dead trees, including a 160-year-old giant redwood and several bald cypresses. These will be replaced by trees of the same species in order to preserve mid 19th century landscaping.

>> Replacing the guardrails on the bridges over the canals.

>> Dismantling and restoring the 1880 wooden landing stage: the landing stage has already been dismantled as it was threatening to fall into the canal. This remarkable Roman-style construction has been put into storage for use as a template and the rebuilt landing stage will be identical, respecting the original colours: oxblood red and ochre yellow for the balustrades. .

 

 

>> Building a shop and positioning information panels.

>> Other major works planned include restoring the main canal, restoring the main locks, rebuilding the pier, and restoring the retention channel.